Zambia, DRC Break Ground On US$68 Million Power Interconnector Project

0
0

Zambia and the Democratic Republic of Congo (DRC) on Sunday took a major step towards strengthening regional energy security following the groundbreaking for the construction of a US$68 million power interconnector project, in Kalulushi.

Zambian president Hakainde Hichilema and his DRC counterpart, Félix Antoine Tshisekedi Tshilombo of DR Congo presided over the ceremony on Sunday, November 29, 2026.

The 62-kilometre, 330kV Chambishi East–New Kasumbalesa Transboundary Interconnector Project, expected to be completed within 12 months, will expand electricity trade between the two countries, strengthen power supply security and support industrialisation and economic growth.

The two countries also signed an Intergovernmental Memorandum of Understanding (MoU) to facilitate the construction and implementation of the project.

Speaking during the ceremony, President Hichilema said Zambia and the DRC shared more than 1,900 kilometres of border and had a common responsibility to strengthen cooperation to meet the aspirations of their people.

President Hichilema said electricity was essential to powering all sectors of the economy, supporting industrialisation and accelerating economic growth.

He emphasised that while Zambia was expanding its electricity generation capacity, there was an equally important need to invest in transmission and distribution infrastructure to ensure electricity reached consumers and could be traded efficiently across borders.

The President said the interconnector would strengthen Zambia’s electricity links with the DRC while creating opportunities to connect with other parts of the African continent.

He commended the private sector for financing the project, saying the investment demonstrated confidence in the economies and policies of the two countries.

President Hichilema further disclosed that he and President Tshisekedi had agreed to deepen joint investments, building on existing cooperation in areas such as electric vehicle battery manufacturing.

He said the two countries also needed to identify and revive idle industrial assets in their respective territories to restore production, create employment and maximise the benefits of shared investment opportunities.

President Hichilema congratulated Lusitu Transmission and Distribution for  undertaking the investment and urged the company to accelerate implementation to ensure the project was completed within the stipulated timeframe.

In his speech, President Felix Antoine Tshisekedi Tshilombo said the DRC was facing an electricity deficit of approximately 1,200MW, making the interconnector particularly important in meeting the energy demands of its mining industry and other economic activities.

President Tshisekedi said the project would renew engagement between the two countries and ensure that citizens on both sides of the border directly benefited from enhanced energy cooperation.

He noted that the interconnector was also strategically linked to the Lobito Corridor, presenting opportunities for increased trade, investment and regional economic integration.

President Tshisekedi reaffirmed his country’s commitment to working with Zambia to ensure the successful implementation of the project, adding that cooperation was essential in promoting development, peace and security for the people of both countries.

Minister of Electricity Eng Peter Kapala said the 330kV interconnector would establish a new pathway for electricity exchange between Zambia and the DRC, creating additional opportunities for power trade in both directions.

Eng. Kapala said the two Governments had agreed to unlock long-standing electricity infrastructure projects and deepen cooperation to maximise the benefits of their interconnected power systems.

He disclosed that ZESCO and the DRC’s national power utility, Société Nationale d’Électricité (SNEL), were expected to sign a new inter-utility Memorandum of Understanding by December 18, 2026, to address the electricity trading requirements arising from the project.

DRC Minister of Hydraulic Resources and Electricity, Mr Aime Sakombi Molendo, said the project would benefit both countries through increased electricity supply, job creation and enhanced economic development.

Mr Molendo said the presence of the two Heads of State at the groundbreaking ceremony demonstrated their shared vision and commitment to strengthening bilateral cooperation.

He urged ZESCO and SNEL to work closely together to ensure the successful implementation of the project.

LUSITU Transmission and Distribution Board Chairperson Margaret Mudenda described the project as a major power highway that would open new opportunities for electricity trading between Zambia and the DRC.

Ms Mudenda said the US$68 million investment was entirely privately financed, demonstrating the private sector’s confidence in the two countries’ economies and the ongoing electricity sector reforms aimed at encouraging private sector participation.

She said the project was also aligned with the Government’s vision of expanding electricity infrastructure and supporting the country’s ambition to increase national generation capacity to 16,000MW.


Discover more from Energy News Africa

Subscribe to get the latest posts sent to your email.