Zesco Limited, Zambia’s power utility company, has temporarily disconnected electricity supply to areas affected by recent flooding in Lusaka, the capital city.
This precautionary measure aims to safeguard lives and property from water-related electrical hazards.
The company has assured that power supply will be restored once the flooding subsides and electrical installations in homes and businesses are confirmed safe.
Zesco warned that flooding can compromise electrical systems, leading to electrical fires, shocks, and even death.
The company advised residents in flood-affected areas to exercise caution:
- Avoid standing in water covering electrical outlets, appliances, or conductors.
- Report fallen electricity lines to Zesco immediately.
- Avoid areas with sparks, popping, or buzzing noises from electrical installations.
- Do not operate electrical equipment or appliances that have come into contact with water.
Source: https://energynewsafrica.com
Discover more from Energy News Africa
Subscribe to get the latest posts sent to your email.